NAVIGATION:         Thumbnails         Labeled Pictures  1  2  3  4  5  6  7  8  9  10  11  12          All Pix Medium Size    
Previous

    Labeled Pictures    

Next
Picture 4
The tunnel entrance after bolldozers had cut into the bank to level it out for an oil well in 1982.  It is estimated that about 25 ft. of the original tunnel was destroyed in the bulldozing operation.